25 мая

OOO Teploenergoremont

̶ Reconstruction of the К-215-130-1 turbine of the power generating unit at the station №2 with reblading of the 27th and 31st stages of the high-pressure hose
̶ Repair of the main and auxiliary equipment during Major repair of a power generating unit at the station №2 at the Pskovskaya GRES