News

5-25-2020

OOO Energoavtomatika

Major repair of a turbine with the wattage of 1,5 MW (produced by KTZ), a Т-1.5-2 generator and auxiliary equipment…

more
5-25-2020

OOO Electroautomatika

Major repair of a turbine with the wattage of 1,5 MW (produced by KTZ), a Т-1.5-2 generator and auxiliary equipment…

more
5-25-2020

OOO Harovsklesprom

Assembly and disassembly, major repair of a TG0,75A/0,4 R13/2 turbo generator (SN 75004) with replacement of winding, a rotor and…

more
5-25-2020

ZAO Technoproekt

Repair of the PT 80-130/13 turbine at the station №3 with reblading of a low-pressure rotor.

more
5-25-2020

OAO TGK №6 (Ivanovskaya CHPP)

Repair of turbo generators, generators and turbine equipment

more
5-25-2020

OOO RN-Tuapsinskiy NPZ

Major repair of a following CHPP heat-power equipment: P-6-3,4/1,0 steam turbine at the station №3 (Kaluga Turbine Works production, 2003…

more