OOO TGK-Service
̶ Repair and restoration work on post-accident damage control at the Vasileostrovskaya CHPP (CHPP-7) of the OAO TGK-1 (SMR) Nevskiy…
̶ Repair and restoration work on post-accident damage control at the Vasileostrovskaya CHPP (CHPP-7) of the OAO TGK-1 (SMR) Nevskiy…
Major repair of a №5 К-250-61-5 turbo-compressor at the ССS for TPP-2.
̶ Repair of the BR-12-90/18М steam turbine wicket gate (with reblading) at the station №9 CHPP AO SHK in Seversk…
Major repair of a steam turbine with a three-phase current generator at the station №3 (equipment №2790).
Installation and connection of equipment on the OAO NPO TSKTE site.
̶ Development of the technical manual for diaphragm gland rings, АК-2,5-35 steam turbine flow range production at the station №3̶…