Our projects

2019 уеаг
1 Inter RAO – Procurement management center 16167 Turbo generator reconstruction at the station №6 for AO Tomskaya generatsiya
2 OOO KVARTZ GroupOOO KVARTZ GroupOOO KVARTZ Group

Major repair of the Т-50/60-8,8 turbine at the station №2 SP GRES, current repair of the Т-43-90 turbine at the station №5 (flow range, rotor metal control) SP GRES-2

– Performance of work as part of the GTE-160 gas turbine plant master inspection at the station №21 of the Kaliningradskaya TETS-2 Branch AO Inter RAO – Electrogeneratsiya

– Assembly and disassembly works on stator winding while carrying out emergency repair of the TFP-160- 2MUZ generator at the station №3 (G-3) on the premises of the Severo-Zapadnaia TETS im. A. G. Borisa Branch AO Inter RAO – Electrogeneratsiya

3 AO MTSBK – Major repair of the PR-6- 35/15/5М turbo generator at the station №5 (equipment №103925)
– Current repair of a steam turbine with a three-phase current generator at the station №4 (serial number №5803, equipment №2791)
4 AO OTEK – Complex of work upon retrofitting of the PT-60/75-130/13 turbo generator condenser at the station №5 (equipment №Н4011683) which is situated at TETS, Krasnokamensk, Zabaykalsky Krai, Russia
– Major repair of the PT-60/75-130 turbo generator at the station №5 of the AO OTEK Branch in Krasnokamensk
5 PAO TGK-2

Complex of design and exploration work upon turbo generator reconstruction at the station №2 to organize new steam controlled extraction with the following parameters P=12 kgf/cm2, t=250C, P=27 kgf/cm2, t=300C for PAO TGK-2

– Construction and installation work upon Т-110/120-130-3 turbine reconstruction at the station №2 with the replacement of …, distributors, nozzle rings, diaphragms for PAO TGK-2

– Complex of design and exploration work upon PT-60-130/13 turbo generator reconstruction at the station №1 with the replacement of diaphragms, rotor blades, valves ATETS for PAO TGK-2

– Construction and installation work upon PVK reconstruction at the station №1 with the replacement of heating area at the Archangelskaya CHPP

– Construction and installation work upon PSG-1 T/A reconstruction at the station №6 with the alteration of exhaustion system ATETS for PAO TGK-2

6 OOO TGK-2 Energoremont -Complex of work upon updating of a generator at the station №4 of the Novogorodskaya CHPP PAO TGK-2
-Installation works on a … chain grate of the TCHZM-2-2,7/5,6 mechanical stoker on site КЕ-25-14С Boiler №5 …, at the heating plant Tsentralnaya, Nyandoma, Arkhangelsk region
-Construction and installation work upon BKZ-50-39f steam boiler reconstruction at the station №2 PAO TGK-2
– Repair of main and auxiliary equipment, buildings on sites of PAO TGK-2
 
7 OOO TGK-Service -All kinds of repair of steam turbine plants, generators and other auxiliary equipment of a CHPP
– Repair of gas air channels (replacement) of the TGME-206P boiler during major repair of a power generator unit at the station №1
– OZP №381/ТS (1000/2.2-828) – All kinds of repair of boiler units, auxiliary equipment and the balance of plant of PTETS for OOO TGK-Service
-OZP №365/ТS (1000/2.2-879) – Major repair of a BKZ-420-140 boiler unit at the station №1 of PTETS for OOO TGK-Service
– Repair of steam turbine plants, generators and other auxiliary equipment of a CHPP for OOO TGK-Service
 
8 Segezhsky PPM Major repair of a turbine plant (model R-12-35/5) at the station №5 of the TPP-2  
9 OOO Company SpetsStroyMash Repair and maintenance service of main and auxiliary equipment as well as the balance of plant  
2018 year  
1 OOO Generiruiushchaya companiya Obuhovenergo Major repair of a PSV 315-14-23 boiler at the station №1 with a full replacement of pipe  
2 AO Sarovskaya Generiruiushchaya companiya – Reaming on the half couplings of the PT-25-90/10 turbine
– Repair of a PR-25-90 turbine flow range
 
3 PAO TGK-14

Installation of a PR-30- 90/10/1,3 steam turbine, auxiliary equipment, pipework and metal structures

 
4 PAO TGK-2 -Construction and installation work upon the unit compressor system of the Arkhangelskaya CHPP for PAO TGK-2
-Repair of the main boiler and auxiliary equipment of the Severodvinskaya CHPP-1 for PAO TGK-2
-Maintenance service of turbo generators of ATETS, STETS-1 PAO TGK-2 control system for PAO TGK-2
– Repair of the main turbine and auxiliary equipment of the Severodvinskaya CHPP-1 for PAO TGK-2
 
– Current repair of a boiler unit at the station №5 (insulation and casing work) of the Severodvinskaya CHPP-1; emergency repair of the hot-air-path air channel of the boiler unit at the station №9 (insulating work) of the Severodvinskaya CHPP-1
-Major repair of a turbo generator at the station №2 of the Severodvinskaya CHPP-2 for PAO TGK-2
-Major repair of a Т- 100/120-130-3 steam turbine plant and the TVF-120-2 turbo generator at the station №5 of the Arkhangelskaya CHPP for PAO TGK-2
– Repair of the main and auxiliary boiler equipment, chemical workshop equipment, repair of casing and insulation of the main and auxiliary equipment for Novgorodskaya CHPP PAO TGK-2
-Major repair of a boiler unit at the station №2 of the Severodvinskaya CHPP-2 for PAO TGK-2
-Repair of the main boiler and auxiliary equipment of ATETS for PAO TGK-2
-Repair of the main turbine and auxiliary equipment of ATETS, AGTS for PAO TGK-2
– Repair of the equipment of the Arkhangelskaya CHPP PAO TGK-2
 
5 PAO TGK-Service OZP №131/ТS (1000/2.2-739) – Repair of steam turbine plants, generators and other auxiliary equipment for OOO TGK-Service  
6 AO Tomskaya generatsiya Current repair of a PT-60-90 turbo generator at the station №7  
2017 year  
1 OOO Komtehenergo -Repair of the main and auxiliary equipment of ATETS, STETS-1, STETS-2
-Current repair of a TP-61-13 turbine at the Yaroslavskaya CHPP
– Construction and installation work on the Customer’s site
 
2 AO MTSBK -Major repair of a PT-12-35-10М turbo generator at the station №2
– Repair of a turbo generator
 
3 AO OTEK Repair of a rotor half coupling of a generator at the station №9 of the OTEK Branch in Seversk, Avtodoroga 14/11  
4 AO Segezhsky PPM Major repair of a PR-6-35-15/5 steam turbine at the station №4 at the turbine room of the TPP-2  
5 OOO TGK-Service -Repair of the main and auxiliary turbine equipment on the site in Apatity, ApTETS industrial site, the Murmansk Region
Repair of the main and auxiliary turbine equipment at the Avtovskaya CHPP-15 of the PAO TGK-1 Nevskiy Branch
 
– Repair of the main and auxiliary turbine equipment of the CHPP (GKPZ 1000/2.2-671)  
6 AO Tomskaya generatsiya Reconstruction work on the turbo generator condenser at the station №7 with the replacement of the tube bundle of the GRES-2 business unit  
7 OOO KHuadian-Teninskaya CHPP Installation of manufacturing equipment on the site of KHuadian-Teninskaya CHPP  
8 OOO YUMZ Major repair of a АR-6-11 turbine at the station №2 and the T2-6-2 generator  
9 OOO Yamalspecstroy -Repair of turbines in Ulan-Ude; Current repair of a turbo unit №1 in Ulan-Ude
-Current repair of a turbo unit №3 in Ulan-Ude
– Repair of turbines
 
2016 year  
1 OOO Avangard

Repair of a AT-6 turbine rotor

Repair of a AT-6 turbine rotor

 
2 AO ANPZ VNK Major repair of a TG-1 turbo generator, TG-1 generator, Current repair of a TG-2 turbo generator  
3 ZAO SZEM Disassembly work and insulation restoring during the I and II stage boiler unit air heater updating at the station №5 at the STETS-1  
4 OOO Bazel-Tsement-Pikalevo Repair of the PV-30 high-pressure regenerative heater  
5 OOO DHO Turbomontazh (OAO Kaluga Turbine Works) Coupling of the TG 8,0/6,3К2 generator half coupling  
6 RAO Inter – AO Electrogeneratsiya -Major and Current repair of a main and auxiliary Т-150- 7,7 steam turbines equipment at the station №10 and 20 for the Kaliningradskaya CHPP-2
– Channeling and buffing of slip rings, balancing of the 1G-PT generator (model TZFP-160-2MUZ 1G-PT) rotor of the Unit 1 (2011 YOM, OAO Power Machines, Saint-Petersburg) (equipment № 04/001769) for the Urengoyskaya GRES 
 
7 OOO KDO Engineering Updating of the TVV-320-2UZ turbo generator stator  
8 OOO Komtechenergo -Repair of the 50-KSC-4 condenser on the PT-65-130 turbine at the station №2 of the Yaroslavskaya CHPP-3 GU OAO TGK-2
-Repair of a condenser at the station №5 of the Yaroslavskaya CHPP-2 GU OAO TGK-2
– Replacement of slip rings of a turbo generator at the Kostromskaya CHPP-2 GU OAO TGK-2
 
9 AO Kyzylskaya CHPP -Development of the technical manual for diaphragm gland rings, АК-2,5-35 steam turbine flow range production at the station №3
– Extended Current repair of a АК-2,5-35 turbo generator unit at the station №3
 
   
10 OOO SVERDMASH Installation and connection of equipment on the OAO NPO TSKTE site  
11 AO MTSBK Major repair of a steam turbine with a three-phase current generator at the station №3 (equipment №2790)  
12 AO OTEK -Repair of the BR-12-90/18М steam turbine wicket gate (with reblading) at the station №9 CHPP AO SHK in Seversk
-Repair of the APT-12-1 BMZ turbo generator at the station №8 on the CHPP site which is situated at ul. Belova 7, Glazov, Udmurt Republic
– Repair of a rotor half coupling of a generator at the station №9 of the OTEK Branch in Seversk, Avtodoroga 14/11
 
13 AO Segezhsky PPM Major repair of a №5 К-250-61-5 turbo-compressor at the ССS for TPP-2  
14 OOO TGK-Service -Repair and restoration work on post-accident damage control at the Vasileostrovskaya CHPP (CHPP-7) of the OAO TGK-1 (SMR) Nevskiy Branch
-Maintenance service of the main and auxiliary equipment, including steam turbines, gas turbines, generators, initiators
– Repair of turbine units and CHPP hardware during major and midlife repair of the equipment on the OAO TGK-1 sites for OOO TGK-Service
 
15 OOO Teploenergoremont Repair of turbines and hardware during the TG-4T major repair  
2015 year  
1 EVRAZ KGOK Major repair of a PR-25-90 steam turbine at the station №1 of the Kachkanarskaya CHPP Branch  
2 OOO KVARTZ Group

Current repair of a TZFP-160-2MUZ turbo generator at the station №1 G-PT with rotor roll-out (equipment № 04/001769, 2011 YOM OAO Power Machines, Saint-Petersburg)

Repair of the thermal and mechanical equipment of the second power-generating unit

 
3 OOO Komtechenergo

Repair of the main and auxiliary equipment of the GU OAO TGK-2 for the Arkhangelsk Region

Repair of the main and auxiliary equipment of the CHPP-1 GU OAO TGK-2 for the Yaroslavl Region

Repair of the main and auxiliary equipment of ATETS, STETS-1, STETS-2

 
4 OOO OPH HEINEKEN

Scheduled maintenance of the SGT-100 Typhoon gas turbine

Repair of gas turbines

 
5 OAO OGK-2 (Pskovskaya GRES) Preventive checkup of culverts of a power-generating unit generator at the station №1  
6 AO OTEK Major repair of a turbo generator at the station №8 on the AO OTEK Branch site in Glazov  
7 ZAO SGK Repair of the Laval turbine flow range at the stations №3, 4  
8 OAO SHK

Major repair of a VKT 100/90/1,2 turbine at the station №11 of the OAO SHK CHPP

Major and midlife repair of the VR-12-90/18м KTZ at the station №9

 
9 OOO TGK-Service

Current repair of a Т-110/120-4steam turbine plant at the station №2 of the Petrozavoskaya CHPP

Major repair of a PTETS

 
10 OOO Teploenergoremont Repair of the TGMP-324 boiler during midlife repair of the fifth power-generating unit  
11 AO Energoremont Major repair of a PT- 80/100-130/13 LMZ steam turbine of the CHPP-2 station of the OAO Kanchatskenergo Kamchatskie CHPPs  
2014 year  
1 ZAO BMK Energolider

System setting of three TK-1 generators excitation, 5-2UHLZ with the VBD-200- 3000UZ exciter; checkup, setting and balancing of the protection system and synchronizing system of three TK-1 generators, 5-2UHLZ under the project based on Sirius-3-GS

 
2 OOO Komtechenergo Major repair of a turbine unit at the station №1 of the STETS-1 GU OAO TGK-2 for the Severodvinskaya CHPP-1 of the OAO TGK-2 Central office for the Arkhangelsk Region  
3 ZAO Lonas technologiya Reconstruction of the Norilskaya CHPP-2. Replacement of medium-pressure turbines.  
4 OAO MTSBK Major repair of a №2626 rotor of the Т-12-2UZ generator (1978 YOM, LGTZ production) at the station №4 of the OAO MTSBK CHPP  
5 OAO SPB KPK Major repair of a turbo generator: R-12-3,4/0,5-1,0 steam turbine and Т-12-2UZ generator  
6 OOO Stavrolen Repair of the TP-650, TP-750, TP-1650 steam turbines  
7 OAO SHK Major repair of a VT-25-4 LMZ turbine at the station №1 of the OAO SHK CHPP  
8 OAO TGK-6 (Penza Branch) Adaptation of Т-110/120-130 turbine at the stations №7 and 8 (mechanical annex) for OAO TGK-6 Penza Branch  
9 OOO TGK-Service

Outstaffing for performing of the following services: Major repair of a Т-110/120-130 repair, TVF-120-2UZ generator at the PTETS station №2 of the OAO TGK-1 Karelsky Branch

 
Major repair of a Т-50/60-8,8 steam turbine plant at the CHPP-7 station №3 of the OAO TGK-1 Nevsky Branch

-Major repair of a TV-60-2 generator of the CHPP-14 of the OAO TGK-1 Nevsky Branch

-Major repair of a TVF-125-2UZ generator of the CHPP-15 of the OAO TGK-1

-Reblading of two RND rotor fields of the T-100 turbine at the OAO TGK-1 Severnaya CHPP-21

-Major repair of a Т- 100/120-130 steam turbine plant (reblading of the second stage of the high-pressure hose) at the Severnaya CHPP-21 of the OAO TGK-1 Nevsky Branch

-Major repair of a ПТ-30-8,8 turbine and TFP-25/6,3-UZ generator. Repair of the ТV-60-2 generator at the Apapitskaya CHPP

 
10 OOO Teploenergoremont

Reconstruction of the К-215-130-1 turbine of the power generating unit at the station №2 with reblading of the 27th and 31st stages of the high-pressure hose

Repair of the main and auxiliary equipment during Major repair of a power generating unit at the station №2 at the Pskovskaya GRES

 
11 OAO E.ON Russia (Yaivinskaya GRES) Updating of turbines at the station №2 with the replacement of condenser pipes and plates  
12 OAO ESK Souz Construction of the PGU-115 power unit for the OAO Quadra Ryazanskaya regionalnaya generatsiya Branch  
2013 year  
1 OAO Volzhskaya TGK Major repair of a turbo generator at the station №5 (Engelskaya CHPP-3) with reblading of two stages  
2 OAO Ilim Group (Bratsk) Localization and emergency repair of the TG-3 turbo generator (equipment №362010400002593). Major repair of a Т-12-2UZ generator rotor, turbo generator (equipment №362010040002593)  
3 OAO Kovdorsky GOK Major repair of a PTVM-50 boiler unit at the station №6 (equipment №1200006804) at the OAO Kovdorsky GOK CHPP  
4 OOO Komtehenergo

Current repair of a PR-20-90-1,2 turbine at the station №2 with preparation for safety expert review

Major repair of a PT-65-130 turbo generator at the station №4 of CHPP-1, CHPP-2, CHPP-3 GU OAO TGK-2 for the Yaroslavl Region

Turbines setting at the CHPP-1, CHPP-2, CHPP-3 GU OAO TGK-2 for the Yaroslavl region. Repair of the PT-60-130 turbine at the station №5

Major repair of a TP-87 boiler unit at the station №4 of GU OAO TGK-2 for the Novgorod region

 
5 OAO MTSBK Major repair of a PR-6-35/15/5М steam turbine at the station №5 of the OAO MTSBK CHPP  
6 OOO OPH HEINEKEN

Maintenance service of a GTP

Repair of a gas turbine

 
7 OAO Sibirenergoengineering

Completion of main and auxiliary equipment installation and preparation for reliability run at the station №7 of the OAO Nazarovskaya GRES

Completion of main and auxiliary equipment installation and preparation for reliability run at the station №4 of the OAO Kuzbassenergo Belovskaya GRES

Installation of the main and auxiliary equipment of a new unit of the Abakanskaya CHPP

 
8 OOO SKH Major repair of a VK-50-2М, LMZ turbine at the station №6 with reblading of the last two stages  
9 OAO TGK-1 Service

Major repair of a TV-60-2 generator (Apatitskaya CHPP). Major repair of a TVS-30 generator at the CHPP-15. Otstaffing for the CHPP-7 to repair power equipment.

Major repair of a TZV-63-2 generator (Centralnaya CHPP).

Repair of an ejector 

 
10 OAO TGK-6 Repair of the EvTETS-2 and EvTETS-3 generators with reblading of the second gear high-pressure hose  
11 OOO TER Severo-Zapad Major repair of a TGM-84 boiler at the station №3 of the OAO OGK-2 Branch (Kirishskaya GRES)  
12 OAO FosAgro-Cherepovets

Major repair of a following turbines: PT12-35/10m (station №1), PT-12/13- 3,4/1,0 m (station №2), PT-12/13-3,4/1,0M (station №5)

Current repair of a following turbines: PT-30-3,4/1,0 (station №6), PT-12- 35/10М (stations №2,5,7), R-12-35/5 (stations №3,4)

Major repair of a K-250 turbo compressor at the station №2

 
13 OOO Harovsklesprom Assembly and disassembly, major repair of a TG0,75A/0,4 R13/2 turbo generator (SN 75004) with replacement of winding, a rotor and an exciter  
14 OAO ESK Souz Expansion of the functioning CHPP of ZAO GSR TETS by constructing two CCGT power units with the wattage of 110 MW. Construction of the first power unit with the wattage of 110 MW  
2012 year  
1 OOO VBM

Repair of a turbine of the P-6-35/5 unit

 
2 OAO Ilim Group (Bratsk)

Disassembly of two turbo-generator sets (1 and 4) with the PR- 6-35/15/0,5 turbines and the Т-6-2 electric generating unit on grids 1-4, B-D, N-S and upper raft under them as part of the Reconstruction of the TPP-3 boiler-turbine shop turbine house project to prepare installation site for new equipment.

Construction of the R-32-90 steam turbine with a generator №1 and the Р-32-90 steam turbine with a generator №4 foundation as part of the Reconstruction of the TPP-3 boiler-turbine shop turbine house project

 
ТProduction and installation of metal structures of a steam turbine with a generator №1 (equipment №36201040014698) and a steam turbine with a generator №4 (equipment №36201040014699) in compliance with technical documentation

Major repair of a TGR-12-35/5 (equipment №362010400002592)

Production and installation of metal structures of a steam turbine with a generator №1 (equipment №36201040014698) and a steam turbine with a generator №4 (equipment №36201040014699) in compliance with technical documentation

 
3 ZAO BMK Energolider Installation of the TK-1,5-2 VUHLZ generator  
4 OOO LMZ-Energo Major repair of a №2 R 635/3 АR-6-3 turbo generator (equipment №4011)  
5 OOO OPH HEINEKEN

Replacement of a generator with a backup one with high voltage testing

Vibration alignment of a GTU (Siemens production)

 
6 ZAO Promyshlenniy Engineering Updating of a turbo generator  
7 OAO RSP TPK KGRES Repair of the main generator equipment of the first CCGT 325 unit of the OAO INTER RAO-Electrogeneratsiya  Ivanovskie CCGTs Branch  
8 OOO RN-Tuapsinskiy NPZ Major repair of a following CHPP heat-power equipment: P-6-3,4/1,0 steam turbine at the station №3 (Kaluga Turbine Works production, 2003 YOM) and the Т-6-2UZ generator (HK OAO Privod Lysva, 2003 YOM)  
9 OAO TGK №6 (Ivanovskaya CHPP) Repair of turbo generators, generators and turbine equipment  
10 OAO RSP TPK KGRES Repair of the PT 80-130/13 turbine at the station №3 with reblading of a low-pressure rotor  
11 OOO RN-Tuapsinskiy NPZ Major repair of a following CHPP heat-power equipment: P-6-3,4/1,0 steam turbine at the station №3 (Kaluga Turbine Works production, 2003 YOM) and the Т-6-2UZ generator (HK OAO Privod Lysva, 2003 YOM)  
12 OAO TGK №6 (Ivanovskaya CHPP) Repair of turbo generators, generators and turbine equipment  
13 ZAO Technoproekt Repair of the PT 80-130/13 turbine at the station №3 with reblading of a low-pressure rotor  
2011 year  
1 OAO Altayskie gerbitsidy Major repair of a PR-6-35/5/1.2 steam turbine plant at the station №5  
2 OOO VBM Major repair of a P-6-3,4/1,0/0,5 steam turbine plant (equipment №8134) at the station №4 with reblading of three stages  
3 OAO VOMZ Major repair of a TG 3,5/10,5Р12/1,2 steam turbine plant and repair of a generator with account for cylinder geometrical arrangement renovation and further repair of a flow range  
4 OAO Ilim Group (Bratsk)

Updating of the TG-1 and TG-4 (PR-6-35/10) steam turbines, automatic control system and steam distribution

Updating of the TG-2 and TG-3 steam turbines in the number of 2 as part of Updating of the TG-1,2,3,4 project implementation, replacement of the generator №3

Full reblading of the R-12-35/5 turbine rotor, supply and replacement of the Т-12-2UZ generator

Upgrading of the Т-12-2UZ generator automatic excitation system at the station №3 and upgrading of the Т2-12-2 generator at the station №2 (SSDM-R12-2 system). Adaptation of the TG-3 automatic control system as part of Replacement of the turbo generator №3 (Т-2-12-2 generator) project

 
5 OOO Evrohim-Belorechenskie minudobreniya Replacement of a condenser without opening the turbine cylinder. Disassembly of an old KP-540 condenser, assembly of a new KP-1000M condenser, chief-installation  
6 ZAO BMK Energolider Major repair of a R-1,5-3 turbine with partial retrofitting in the number of three and repair of auxiliary equipment  
7 ZAO International Paper (Svetogorsk)

Major repair of a second turbine at the CHPP-3 and Major repair of a exciter armature of t/g №2 at the CHPP-3 (R-12-35/5 turbine with Т-12-2UZ generator), reblading of seven stages of the R-12-35/5 turbine rotor.

Repair of bearings on the second turbo generator at the station №2 of the CHPP-3, Major repair of a exciter armature of the second turbo generator at the CHPP-4, Major repair of a second turbo generator electrical parts at the CHPP-3, Major repair of a fourth turbo generator electrical parts at the CHPP-4

Major repair of a fourth turbo generator at the CHPP-3, repair of the first turbo generator at the CHPP-3,  repair of the first turbo generator at the CHPP-4, repair of the third turbo generator at the CHPP-3 (R-12-35/5 turbo generating set with the Т-12-2UZ generator), full reblading of two rotors

 
8 OAO MTSBK Current repair of a PR-6-35/15/5 steam turbine plant  
9 OAO Mondi Syktyvkarsky LPK

Major repair of a PT-27/35-3,9/1,7 turbo generator and a Т-32-2VZ generator with excitation system, reblading of the first control stage gear and low-frequency vibration isolation

 

Replacement of the tube system of an integrated bunch of a 80 KTSS-1 turbo generator at the station №5

Further major repair works of a PT- 27/35-3,9/1,7 turbo generator and a Т-32-2V4 generator

 
10 OAO NPO TSKTE Full replacement of KP-480 condenser trim and a АТ-6-35-/1,2 turbine  
11 OOO Perlit Major repair of a following CHPP heat-power equipment: a PR-6-35/10/5М steam turbine with full repair of auxiliary equipment  
12 OOO Proektny tsentr BiKZ Supply of equipment, installation and commissioning of a turbo generator which consists of a R-1,5-1,5/0,3 steam turbine, a Т2B-1,5-2 generator and auxiliary equipment  
13 OOO RN-Tuapsinsky NPZ Major repair of a following CHPP heat-power equipment: a P-6-35/5М steam turbine (Kaluga Turbine Works production, 1993 YOM), a Т 6-2 generator  
14 OOO Suhonsky TSBK Supply of equipment from our own storage area with further construction and installation work and commissioning and a turnkey R-12-35/5М turbine  
15 OAO Permsky TGK-9 (Tchaikovskaya CHPP-18) Incoming inspection of RVD-RND coupling  
16 ZAO Teplo RKK Major repair of a Т2B-1,5-2 generator with replacement of winding, disassembly and assembly estimated  
17 ZAO UK BMZ (Bryansk) Vibration testing and technical evaluation of a R-12-35/5М steam turbine  
18 OOO Energosnab Finishing of a control valve of a steam supply pipe  
19 OAO Yuzhno-Kuzbasskaya GRES

Major repair of a К-50-90 turbo generator at the station №1 with reblading of the last low-frequency stage

Major repair of a PK-10 230 boiler unit at the station №7 (1951 YOM with accumulated operating time of 345-395 hours) with replacement of heating area

Repair and setting of control and protection system for VK-100-90 LMZ and VK-50-90 LMZ turbo generators at the stations №6 and 7 respectively

Balancing of VK-50-90, Т-115/8,8, VK-100-90 turbo generators at the station №7, 5 and 6 respectively

Remedial work on during emergency repair

Emergency repair of a К-50-90 turbine at the station №2

Current repair of a ВК-100-90 turbo generator at the station №6

 
2010 year  
1 OAO ANPZ VNK Major repair of К-6-30 and R-6-35/5 turbo generators and repair of the first turbo generator  
2 OAO Borovichi Refractories Plant Repair and setting of a АТ-6-35 turbine control unit, setting was performed on the bench jointly with OAO KTZ staff  
3 OOO VBM Major repair of a P-6-35/5/1,2 steam turbine plant (individual number 400104) with full babbitting  
4 OAO SSC RIAR (ROSATOM) Major repair of an АR-2,5 turbine, replacement of the last two stages rotor blades  
5 ZAO International Paper (Svetogorsk)

Major repair of a third turbine and Current repair of a second turbine at the CHPP-3 (R-12-35/5М turbo generators at the station №3 of the CHPP-3 and Т-12-2UZ generator at the station №2 of the CHPP-3). During major repair reblading of a Р-12-35/5М turbine rotor was carried out

Current repair of a first turbine at the CHPP-3 (R-12-35/5 turbine with Т-12-2UZ generator) and the first turbine at the CHPP-4 (R-12-35/5 turbine with Т-12-2UZ generator)

 
6 OAO Kyzylskaya CHPP Major repair of a АК-6- 35 turbo generator at the station №4, debugging of half coupling mounting by gas spraying and mounting seat grooving  
7 OAO Rusal Boksitogorsk

Replacement of pipes of №2 DK- 20-120 turbo generator lower part

Elimination of a DK-20-120 turbo generator high-pressure rotor at the station №1

Major repair of a №3 PR-6-35/15/5 turbo generator with reconditioning of a PR-6-35/15/5 turbine parting face

 
8 OAO Selinginsky TSKK Repair and upgrading of a PT-12-35/5 turbine at the station №1 and upgrading of a PT-12-35/10М steam turbine (SN 7542), upgrading of an automatic control system and steam distribution systems with flow range upgrading  
9 OOO Solombalsky TSBK Major repair of a PT-12-35/10М steam turbine (SN 7539)  
10 OAO TGK-9 Permsky Engineering management of PT 60-130/13 turbo generator repair, reblading of a low-pressure rotor and coupling replacement  
11 OOO Energosnab Finishing of a steam … control valve (Т-44/50-90 turbine of OAO KTZ production) for the Pervomayskaya CHPP  
2009 year  
1 ZAO International Paper Repair of a R-12-35/5 turbine (SN 9252), the first generator at the CHPP-4 with attachments replacement and generator testing  
2 OOO PKK Vostok – Zapchast Repair of «Tuman – 2а» turbines  
3 OOO Stavrolen Major repair of TP600 and TP750 steam turbines  
2008 year  
1 Siberian-Urals Aluminium Company (OAO SUAL) PGLZ Major repair of a PT-30/35-3,4/1,0 steam turbine with replacement of high-pressure cylinder  
2007 год  
1 OOO Energoremont Repair of turbines  
Supply of spare parts for power equipment  
Customer work executed  
2019 year  
1 OOO BEM Supply of a culverts heating inductor  
2 Vostokenergomontazh Supply of PT-12-35/10М turbine blades  
3 AO ROSENERGOATOM Beloyarskaya atomnaya stantsia Supply of an eleventh stage coupling of a TG-4 high-pressure cylinder  
4 AO Kyzylskaya CHPP

Supply of the following factory built spare parts:

H. dog blocks (operational) (1 kit, 8 pieces 188-С-115)

R.H. dog blocks (mounting) (1 kit, 4 pieces 188-С-118 

 
5 AO MTSBK Supply of R-12-90/31М turbine spare parts  
6 AO NNK Steam turbine spare parts (1341601 high pressure cylinder valve stem)  
7 PAO TGK-2 Supply of a brass tube for condensers repair  
2018 year  
1 AB ENERGO Supply of spare parts for Т-185/220-130 and R-50-130/13 turbines for AO TGK-11  
2 PhosAgro Group of Companies Spare parts for a PT-12-35 steam turbine (Balakovo)  
3 OOO EuroSibEnergo -Supply of spare parts in the LMZ nomenclature
-Supply of spare parts in the KTZ nomenclature
 
4 OOO Inter RAO – Procurement management center -Supply of turbine spare parts for AO Tomskaya generatsia in 2018
Turbines equipment and spare parts for ZAO Moldavskaya GRES in 2018
 
5 AO Rosenergoatom Kolskaya atomnaya stantsia Supply of spare parts for heat supply system pumps

-Supply of spare parts for emergency cooling system pumps

Supply of spare parts for pumps

 
6 AO Rosenergoatom Rostovskaya atomnaya stantsia Supply of condensate extraction and axial pumps attachments  
7 AO Minudobreniya Rossosh Supply of a 5VZH.263.002-01 bearing  
8 OOO PROMTURBO Supply of a nonreturn valve  
9 PAO SAKHALINENERGO Right of making contract for PT-60-130 turbine spare parts  
10 PAO TGK-2 Supply of fire protection equipment and equipment for PAO TGK-2  
2017 year  
1 OOO BGK – Supply of turbine spare parts (R-50- 130/13) for OOO BGK Sterlitamakskaya CHPP Branch in 2018  
2 OAO Gomel Chemical Plant -Supply of spare parts for R-6 turbo generator and EKN-20-50 pump
-Supply of spare parts according to specification
 
3 OAO Ilim Group Supply of EP-3-700 ejectors  
4 Vostokenergomontazh Supply of spare parts for PT-12-35/10 turbines  
    – Supply of spare parts for PT-12-35/10 and P-6-35/5 turbines  
5 AO Rosenergoatom Supply of spare parts for condensate pumps

-Supply of spare parts for special pumps

Supply of spare parts for essential service water system pumps

 
6 AO CONCERN TITAN-2 Integrated supply of equipment for power units №1 and 2 of the Leningrad NPP-2  
7 OOO Lenrem Supply of a Т2-6-2 generator (1960 YOM)  
8 OAO Mozyr Oil Refinery Supply of SPTA for turbine equipment  
9 PAO Omsky kauchuk Supply of spare parts for major repair of a R-12-3,4/1,0 turbine (SN 14501, 2005 YOM)  
10 OOO PTTK Spare parts for Т-125/150 turbines and alterations for the PAO Mosenergo CHPP-27  
11 OOO Sibgenco Supply of spare parts for turbines

-Supply of spare parts for PR-6

Supply of spare parts for turbines for AO Nazarovskaya GRES

 
12 Segezha Pulp and Paper Mill Supply of a rainfall run-off treatment plant  
13 OOO Sibur Tobolsk -Supply of spare parts for turbines
Supply of spare parts for turbine equipment
 
14 PAO T Plus -Supply of a seal face insert for a TVV-320-2UZ generator  
15 TGK-Service Supply of a seal face insert for a TVV-320-2UZ generator  
16 AO Tomskaya generatsia Spare parts for turbo generators  
17 OOO UKM Zavod Supply of spare parts according to specification  
18 OOO ORRO Production and supply of products according to specification  
2016 year  
1 OAO Belenergoremnaladka Supply of spare parts for steam turbines  
2 OOO BGK Spare parts for a PT-60-90/13 turbine  
3 RUE Gomelenergo Spare parts for a Т-180/210-130 turbine  
4 OOO GES Spare parts for power equipment  
5 RAO Inter – AO Electrogeneratsiya -Spare parts for turbines for the Kostromskaya GRES Branch
Spare parts for turbines for the Gusinoozerskaya GRES Branch
 
6 OOO PPTK -Spare parts for a turbine for the PAO OGK-2 Surgutskaya CHPP-1 Branch
Spare parts for a generator (studs, gaskets)
 
7 OOO PROM TURBO Supply of spare parts  
8 PAO RusHydro Manufacturing and supply of spare parts for turbine equipment fastener parts  
9 OOO Sibgenco Spare parts for turbines for the Kuzbass Branch  
-Supply of spare parts for the AO Eniseyskaya TGK Minusinskaya CHPP Branch
Supply of turbine spare parts for AO Nazarovskaya GRES
 
10 OOO UKM Zavod Supply of spare parts for a R-2,5-21/3 steam turbine  
11 PAO Yakutskenergo Supply of slip rings for a TVF-63-2ЕUZ turbo generator  
2015 year  
1 TOO Karaganda BI Energy Plus Supply of the following equipment: dynamic balancing machine, heavy-duty lathe, bench for rotors disassembly, tilting unit  
2 TOO Pavlodar Trading Terminal Supply of spare parts for turbines  
3 Vostokenergomontazh Spare parts for PT-12-35/10 and P-6-35/5 turbines  
4 RAO Inter – AO Electrogeneratsiya Spare parts for a turbine for the Gusinoozerskaya GRES Branch  
5 OOO Capital Story Supply of spare parts  
6 ZAO Moldavskaya GRES Spare parts and turbine attachments  
7 OOO Nevskaya perspectiva Supply of spare parts  
8 OAO NPO TSKTE

Supply of hardware for a drainage pipeline

Supply of a gate valve complete with and electric drive

 
9 AO TGK-11 Supply of a ST-209013 half coupling  
10 OOO TGK-Service Manufacturing of spare parts  
11 ZAO PhosAgro AG Supply of a NCH 8VZH 555 064 slip ring for a Т2-12 generator rotor  
2014 year  
1 OM Technical Soluions (Mumbai) Spare parts for a К-12-6,4Т turbine  
2 OOO VTF Izhora Trade Manufacturing and supply of blank parts and finished hardware items  
3 OAO Ilim Group Supple of spare parts for R-12-35/5 and PR-6-35/15/5 turbines  
4 OOO Prom Turbo Supply of a Tr 151948 fifth stage coupling  
5 OOO Tealink Supply of half couplings  
2013 year  
1 OOO OO Karaganda BI Energy Plus Supply of spare parts  
2 OAO Geotherm Supply of an oil turbo pump by the drawing 208-b-0153  
3 OOO TD Ruselprom Supply of spare parts  
4 OOO ElectroTechSnab KZ Supply of spare parts  
5 OAO Enel OGK-5 Supply of two 465*465*325 collectors  
2012 year  
1 OAO Gaysky GOK Supply of spare parts for the following turbines: PR-6-35/5/1,2 (SN 8835), R6-35/5М-1 (SN2262), R-6-3,4/0,5-1 (SN 2267), R-6-35/5М (SN 4159)  
2 OAO Ilim Group (Bratsk) Supply of high-pressure check valves. Supply of products for a R-12-35/5 turbine (OAO KTZ production)  
3 OAO Magadanenergo Supply of spare parts for a PT-25-90/10М steam turbine (SN 9182)  
4 OAO NLMK Supply of spare parts for power generating equipment according to specification №1  
5 OOO Sukhonsky TSBK Supply of pipelines and metal structures necessary for R-12-35/5 turbo generator installation  
6 OAO Tchukotenergo Supple of spare parts (Tchaunskaya CHPP Branch). Supply of spare parts according to specification (Anadyrskaya CHPP)  
7 TOO Ekibastuz GRES-1 Supply of an emergency governor  
2011 year  
1 OOO Azerbaidzhanskaya TPP Supply of spare parts for TVV-320-2UZ turbo generator repair, namely supply of culverts with our own complete cycle of manufacturing  
2 TOO Atyrausky NPZ Supply of spare parts and equipment for a P6-35/1,0 turbine (SN 4004;4001)  
3 OAO Borovichi Refractories Plant Supply of spare parts for a R-2,5-21/3 turbo generator  
4 OOO Engineering systems Supply of spare parts for К-6-30P and R-6-35/10М-1 turbines and 12-110Т electrical pumps  
5 ZAO International Paper (Svetogorsk) Supply of spare parts for a R-12-35/5 turbo generator (SN 9252)  
6 OOO EuroChim-Belorechenskie minudobreniya Supple of spare parts for a PT-12-35/10М turbo generator (SN 7563), supply of a КP-1000М condenser, an EО-50-М ejector, a reducer  
7 OAO NLMK Supply of spare parts for a R-12-90/18 turbo generator (SN 8607)  
8 OOO ORELKOMPRESSORMASH Supply of spare parts for PKS-3,5А equipment  
9 OAO Saratovskaya GRES Supply of spare parts for a R-12-3,4/0,1 turbine  
10 OOO Sibzheltorg Supply of spare parts for a ОК —18PU turbo generator  
11 OAO Tchukotenergo

Supply of spare parts for a PT-25- 90/10М turbine (OP Anadyrskaya CHPP)

Manufacturing and supply of spare parts for repair of the following turbines: АК-1.5 (4-3) ТП-5 SN 5530 turbine, АК-1,5 (4-4), ТG-4 SN6713 turbine (for the Tchaunskaya CHPP Branch)

Supply of spare parts according to PT-12- 35/10М specification SN 75114 1992 YOM (Egvekinotskaya GRES)

 
12 Emet Trade (Pavlodar) Supply of the following spare parts: electro magnetic filter and mechanical filter  
13 OAO Yuzhno-Kuzbasskaya GRES Supply of eighteenth stage operational blades for a VK-50-2 turbine (SN 482) at the station №7  
2010 year  
1 AZENCO, ОАО

Supply of spare parts for a TVV -320-2UZ generator

Supply of spare parts for the first turbo generator (LMZ RО75/728-V-410 production)

 
2 OAO Vostochnaya neftyanaya companiya Achinsky NPZ VNK Supply of spare parts for R-6-35/10-М1 and К-6- 30P turbo generators  
3 OAO Geotherm Supply of spare parts for a К-25-0,6 Geo turbine generator  
4 ZAO International Paper (Svetlogorsk)

Supply of spare parts for R-12-35/5 turbo generators as attached

Supply of the following spare parts: 5 security valves

Supply of spare parts for a R-12-35/5 turbo generator (SN 9272, SN 9252, 1974 YOM) and a R-12-35/5М turbo generator (SN 1974, 9287)

 
5 OAO Kyzylskaya CHPP Supply of spare parts for an АК-6 turbo generator  
6 OAO Magadanenergo Supply of spare parts for a PT-25/30-90/10М turbo generator (SN9182)  
7 OOO Perlit Supply of spare parts for a PR6-35/10/5М turbine (SN 8326) (rotor, coupling, packing)  
8 GUP PEO Baikonurenergo Supply of steel 12H1MF and 17G2S pipes  
9 OOO Stavrolen Supply of spare parts for 125-140 and 50-110 electric pumps  
10 OOO Torgovy Dom NLMK Supply of spare parts for a R-12-90\18 turbo generator  
11 TOO Ekibastuz GRES-1 Supply of spare parts for a ОК-18PU steam turbine (OAO KTZ production)  
Монтаж технологического оборудования, трубопроводов,
металлоконструкций
 
Customer work executed
2019 year  
1 PAO TGK-2 -Construction and installation work on reconstruction of a KUP-2 grab car trolley runway at the Severodvinskaya CHPP-1 for PAO TGK-2
Construction and installation work on a live steam steam pipe to a turbo generator at the station №2 with increase of WT for PAO TGK-2
2 OOO TGK-2 Energoremont Repair of equipment, heat networks and Arkhangelsk boiler houses
3 OOO TOR Installation of metal structures on the site of Ust-Ilimks Pulp and paper mill in Ust-Ilimsk
2017 year  
1 OOO Dorozhnik Manufacturing and installation of metal constructions            
2016 year  
1 OOO Alyans-MK (for LenspecSMU) Installation of metallic enclosures on the site of Tsarskaya Stolitsa the third set, building 6A
2 ZAO Monolit-Kirovstroy Installation of metal structures in the Ulyanka Housing Complex      
3 OOO Energoresurs  
4 CC Times Metal ware installation
2015 year  
1 OO Alyans-MK Installation of metallic enclosures on the site of Tsarskaya Stolitsa the third set, building 7A
2 Codest International Metal ware installation
3 TOO KORUND Consultative and engineering services (consultative and engineering services on manufacturing process preparation, pre-lay survey, development of work execution process, operating staff consultation on repair work execution process)
4 OAO NPO TSKTE Engineering of steam pipeline and dry return system for electric facility functioning
2014 year  
1 OOO TOR Group Installation of production equipment on the site of OAO Slavneft-YANOS
2 IDZHA ASTALDI-IDZH ISTASH VHSD INSHAAT ANONIM SHIRKETI AK Installation, initiation, commissioning of eight frame cranes and railways; making monthly work execution historical records; supply and installation of rail buffer
3 OOO Remiindustriya TSGFU-3 unit retrofitting with the replacement of bottoms of columns heating from heating stoves to boilers
4 ZAO SU-267 Metal ware installation on the Lastochkino gnezdo site
5 OOO Teploenergoremont Repair and cleanout of blow case metal, cleanout of pipeline metal during K-5T boiler major repair
2013 year  
1 OOO Gidrodinamika Removal of scale and sediments on inner heating surfaces of boiler equipment; cleanout of sewerage nets pipelines; cleanout of heating systems pipelines; removal of sediments in hot and cold running water exterior piping; cleanout of random shape vessels under Customer’s request  
2 OAO Ilim Group (Bratsk)

Modification of the first stage pulp and paper mill:

Installation of industrial pipeline of total length 4,5 km

Installation of industrial pipeline of the first and fourth turbo generator fitting of total length 5 km

Replacement of the worn Zultser N-41 TRU equipment

3 OAO Sibirenergoengineering

Completion of main and auxiliary equipment installation and preparation for electrical generating unit reliability run at the station №7 of the OAO Nazarovskaya GRES

Completion of main and auxiliary equipment installation and preparation for electrical generating unit reliability run at the station №4 of the OAO Kuzbassenergo Belovskaya GRES

Installation of recirculating and manufacturing water pipelines on the site of the Tom-Ustinskaya GRES Branch

Reconstruction of the 5th and 4th units at the Tom-Ustinskaya GRES Business Unit of the OAO Kuzbassenergo Kuzbass Branch

Installation of main and auxiliary equipment of the Abakanskaya CHPP New Unit

4 OOO SibEnergoMash

Supply of a DE-25 boiler unit with construction and installation work and commissioning

Development of project documentation

5 OOO TGK-1 Service Repair of ejectors and UVG oil cooler
6 OOO TER Severo-Zapad Repair of VVU-110 airblast switches
2012 year  
1 OAO Ilim Group (Bratsk)

Change in fitting of SRK-11 boiler economizer feedwater

Manufacturing from Customer’s materials and installation of low-pressure steam pipelines, installation of pipeline heat insulation as part of Reconstruction of the KTTS CHPP-3 turbine house with installation of two back pressure turbines with the live steam pressure of 90 bar project

Lamination of DERAKANE pipelines in the chlorine dioxide production shop, lamination of chlorine dioxide and chlorine hydride storage, lamination of an oxygen plant

Additional work: installation of a pipeline in the SRK-14 zone of total length 1,5 km

Installation of fire safety system pipeline in the utility tunnel of the second woodchip unprotected storage of total length 2 km
2 OOO Montazhspecstroy Retrofitting of the recausticizing, lime recovery and chemical supply shop. Total length of pipeline is 5, 5 km
3 ZAO REPH Supply and installation of KsD140-140 pumping units
2011 year  
1 ZAO International Paper

Restoration of a compressor liner by babbiting

Repair of the first and second turbo generator KIPiA equipment at the CHPP-3 and 4

2 ZAO REPH Supply and installation of EKN 125-140 equipment with an electric motor (without start-control devices), water strainer, spare parts
2010 year  
1 ZAO REPH Supply and installation of EKN 125-140 equipment with an electric motor (without start-control devices), water strainer, spare parts
Производство металлоконструкций  
Customer work executed  
2016-2017 years  
1 OOO Alyans-MK (for LenspecSMU) Installation of metallic enclosures on the site of Tsarskaya Stolitsa the third set, building 6A  
2 PAO Vyborg Shipyard Production and supply of a lodge  
3 OOO GlavVoenStroy Construction work on production and installation of metal structures on the construction site Srednyaya obshcheobrazovatelnaya shkola na 600 mest  
4 ZAO Monolit-Kirovstroy Installation of metal structures in the Ulyanka Housing Complex  
5 OOO Normann-Stroy Production and installation of metal structures in the building №3 on the site of major construction work Apartment building with integral premises, outside parking (parking lot), underground car park, transformer box  
6 PAO Proletarsky zavod Production of a TSAKI.301228.235 frame  
2 AO Renaissance Construction Production and installation of metal structures  
7 OOO CC Postscriptum Production of ramp metal structures  
8 CC Times Metal constructions production  
9 ZAO YUIT Saint-Petersburg -Production, supply and installation of metal structures on the Novoorlovsky site
Production, supply and installation of metal structures of 1, 2, 3, 4 units surface on the site 0198-82 which is situated at lot 82, Gummolosary, Pushkinsky district, Saint-Petersburg
 
2015 year  
1 OO Alyans-MK Installation of metallic enclosures on the site of Tsarskaya Stolitsa the third set, building 7A  
2 OOO AS-Engineering Buildings and storage metal structures production  
3 OAO Compact Supply of embedded items metal structures and guard rails for LAES-2  
2014 year  
1 ZAO SU-267 Metal ware production on the Lastochkino gnezdo site  
2010 year  
1 OOO Sevlent Production of metal structures and spare parts on the production base from our own material  
Общестроительные и дорожные работы  
2019 year  
1 Vasilevsky District Council, Saint-Petersburg Repair of yard paving in 2019. Address: corner of ul. Nalichnaya and ul. Odoevskogo (Primorskaya metro station), V.I., Saint-Petersburg
Project design work on urban land impovement. Address: corner of ul. Nalichnaya and ul. Odoevskogo (Primorskaya metro station), V.I., Saint-Petersburg 
   
2 OOO Akkord Integrated major repair of a pool and hydropathical with replacement of manufacturing equipment in SPB GBUZ Municipal Polyclinic №51    
3 PAO Buryatnefteproduct Rebranding of the second fuel filling station for PAO Buryatnefteproduct    
4 AO Russian Regional Development Bank Replanning and alteration with repair of the 16-N non-residential facility which is situated at nab. Voskresenskaya, d. 6-8, Saint-Petersburg for RRDB Bank (AO) in Saint-Petersburg    
5 Local government of Kupchino Municipal District Urban improvement work of Kupchino Municipal District in 2019    
6 OOO RN-Severo-Zapad Current repair of a control room building and … at a fuel filling station (as part of rebranding) for OOO Gatchinskaya neftyanaya companiya

Current repair of a control room building and … at a fuel filling station (as part of rebranding) for OOO PTK Terminal

Current repair of a fuel filling station display area with replacement of brand elements (as part of rebranding) for OOO PTK Terminal

Current repair of a floating refueling station №905. Development of the PAO NK Rosneft Corporate Identity

   
7 Resocialization center for disabled people and disabled children of Kronshtadtsky District in Saint-Petersburg Urban improvement work of land and setup of outdoor lightning on the territory of Kronshtadt    
8 PAO TGK-2 Construction and installation work on upgrading of the Severodvinskaya CHPP-1 coalbarn lightning network with its switching to LED-Based lightning for PAO TGK-2    
 Construction and installation work on improving anti-terrorism security and technical resistance against burglary of the NPP for PAO TGK-2    
2018 year  
1 GOU Saint-Petersburg Water and wastewater treatment plant Major repair of a building I and … water treatment station in p. Potanino PY Volhovsky District    
2 Aerospace Equipment Corporation Construction of a perinatal center in Petrozavodsk    
3 AO Tambovnefteproduct Current repair of operating room buildings and fuel station fore-roofs (№163,164,167,168,170) with brand elements    
4  PAO TGK-2 – Construction and installation work on upgrading of a distribution gear (0,4 KV) with installation of a distributing system 220V in the boiler room of the Severodvinskaya KTTS CHPP-1 (equipment №2200150217) for PAO TGK-2 STETS-2
Repair of PAO TGK-2 Arkhangelsk CHPP buildings
   
2017 year  
1 OOO VSV ElectroMontazh Construction and installation work on asphalt covering    
2 SBGEI GES №472 im. A.T.Karpova Repair in the SBGEI GES №472 im. A.T.Karpova building in Vyborgsky District, Saint-Petersburg    
3 SBGEI School-kindergarten №662 Urban improvement work    
4 OO RN-Severo-Zapad Current repair of a control room building and … at a fuel filling station in Saint-Petersburg (as part of rebranding)    
2016 год  
1 OO RN-Trade Current repair of an apartment which is situated at ul. Zvezdnaya, d. 9, k. 1, kv. 235, Saint-Petersburg    
2015 year  
1 OOO Junix Construction and installation work, including recourses support of the Integrated plant LK-2B (facility 310-10). It is a complex of high-octane petrol components production with connection of these facilities to other facilities, networks and communication lines    
2014 year  
1 Military base 2438 Repair of the roof. Address: pl. Svobody, d. 3, Sestroretsk    
2 OAO Gostinichny complex Slavyanka

Repair of bathrooms of hotel room capacity (38 rooms) on the ninth floor for the Orbita hotel (OAO Gostinichny complex Slavyanka Branch)

Construction and installation work on the site of Construction of a vacuum unit for ELOU-AT-6 unit. MTSK

   
3 OOO Remiindustria

Outstaffing for a vacuum unit for ELOU-AT-6 unit construction on the site of ZAO Ryazan Oil Refining Company

   
Construction of a vacuum unit for ELOU-AT-6 unit. MTSK.    
4 OOO RN-Trade Repair of an railroad overpass at the p.g.t i. Morozova oil plant which is situated at ul. Chekalova, d.3, p.g.t i. Morozova, Vsevolozhsky District, Leningrad Region, 188679    
5 OOO Rossoshanksoe montazhnoe upravlenie Construction and installation work on retrofitting    
2013 year  
1 OAO Gostinichny complex Slavyanka Repair of the hotel rooms capacity in the Orbita hotel    
2 OAO Ilim Group (Bratsk) Construction and installation work on Customer’s Branch facilities    
3 OOO RN-Trade

Repair of asphalt paving locally estimated on the following facilities:

Filling station №1 (ul. Koroleva, d. 40, Saint-Petersburg)

Filling station №2 (ul. Marshala Kazakova, d. 25, Saint-Petersburg)

Filling station №5 (prosp. Veteranov, d. 182, Saint-Petersburg)

Filling station №6 (ul. Fedununskogo, d. 1-A, Lomonosov)

Filling station №7 (sh. Vyborgskoe, d. 222, k.2, p. Pargolovo)

Filling station №10 (ul. Lenina, d. 2v, p. Shushary)

Filling station №11 (1-y Verhny prosp. Kultury, d. 30, Saint-Petersburg)

Filling station №12 (prosp. Lenina, d. 2, k. 4, Krasnoe Selo, Saint-Petersburg)

Filling station №13 (ul. Fuchika, d. 23, k. 1, Saint-Petersburg)

Repair of roof cladding locally estimated on the following facilities:

Filling station №3 (prosp. Vitebsky, d. 91, Saint-Petersburg)

Filling station №4 (p. Yushkovo, 120-y km trassy Kola, Volhovsky District, Leningrad region)

Filling station №5 (prosp. Veteranov, d. 182, Saint-Petersburg)

Filling station №6 (ul. Fedununskogo, d. 1-A, Lomonosov)

Filling station №15 (ul. Budapeshtskaya, d. 116, Saint-Petersburg)

   
4 OOO SZSP Installation on the third stage of production (expansion) of Goluboy fakel resort in Novgorod Region    
(reconstruction of the lodging house №9/10, construction of the lodging house №11)    
2012 year  
1 OAO Ilim Group (Bratsk)

Installation of mounting blocks for a steam turbine pipeline with the first generator and a steam turbine with the fourth generator

Construction of columns and walls

General construction work for sole surveying for a steam turbine pipeline with the first generator and a steam turbine with the fourth generator

Construction and installation work at the premises of the PTK