References

OOO “Turboenergoremont” (Turboenergoremont, LLC) has been successfully working in the energy and construction markets of RCIS countries for many years, successfully performing construction work of any complexity.

The company has carried out a large number of repairs, updating of energy and technological facilities. To this date, the company is working on the repair and modernization of equipment, as well as on the installation of technological and power equipment.

This section only partially presents projects that have successfully undergone the repair, installation and modernization of power and process equipment. Work on expanding the electronic list is carried out daily.

A full list of works on repair, installation and modernization of power and technological equipment, as well as construction works is presented in the section Our projects.

This section contains thank-you letters and feedback on our work

  1. Energospetsstroy (Kazakhstan) – repair of steam turbine rotors K-500-240 (LMZ).
  2. Mari pulp and paper mill – repair of turbine generator P-6-35/5 (KTZ).
  3. School №472, Saint Petersburg – the school was renovated.
  4. Tomsk generation, InterRAO – delivery of spare parts for the turbo generator.
  5. Gomel CHPP-2 (Belarus) — delivery of spare parts for the T-180/210-130 turbine.
  6. TGC-Service – repair of the T-100/120-130 turbine (TMZ).
  7. TGC-Service – repair of the PT turbine-25-90-10 (UTMZ).
  8. Teploenergoremont – repair of the turbine and fittings at the Kirishskaya GRES, OGK-2
  9. NPO TSKTI – construction of the energy center.
  10. Remindustria – construction and installation works were carried out for the Ryazan oil refining company.
  11. We made a number of joint projects with International paper. 
  12. IDGC of Volga – electrical installation works were carried out.
  13. Turbomarket – construction of an energy center has been completed.
  14. Vostokenergomontazh (Mongolia) – delivered products for the repair of steam turbines.
  15. Kovdorsky GOK (EuroChem) – repair of the PTVM-50 boiler was made.
  16. Sinarskaya CHPP – installation work was carried out during the reconstruction of the T-12-35/1,2 turbine unit.
  17. Novgorodskaya CHPP, TGCR-2 – repair of the main and auxiliary equipment was carried out.
  18. Volzhskaya TGC – carried out major repairs of the PT-80/100-130/13 turbine unit.
  19. Ivanovo branch, TGC-6 – seven steam turbines and three generators were repaired
  20. Heineken Brewery – a generator was replaced and a vibration inspection of the GTU was conducted.
  21. Concord – restoration of asphalt pavement and installation of ventilation and condensation systems.
  22. Pikalevsky alumina plant, SUAL – major repairs of steam turbines.
  23. Administration of the Kronshtadtsky district of Saint Petersburg – repair of the paving.
  24. Kapital Stroy
  25. Nevskaya Perspektiva
  26. Stroybalt

Certainly, there are many more facilities where we have successfully carried out repair, installation and modernization of power and technological equipment than it is presented in this section. We are constantly working on expanding this site section.

A full list of works on repair, installation and modernization of power and technological equipment, as well as construction works is presented in the section Our projects.