5-25-2020
AO Tomskaya generatsiya
Current repair of a PT-60-90 turbo generator at the station №7
Current repair of a PT-60-90 turbo generator at the station №7
OZP №131/ТS (1000/2.2-739) – Repair of steam turbine plants, generators and other auxiliary equipment for OOO TGK-Service.
– Current repair of a boiler unit at the station №5 (insulation and casing work) of the Severodvinskaya CHPP-1; emergency…
– Construction and installation work upon the unit compressor system of the Arkhangelskaya CHPP for PAO TGK-2– Repair of the…
Installation of a PR-30- 90/10/1,3 steam turbine, auxiliary equipment, pipework and metal structures.
– Reaming on the half couplings of a PT-25-90/10 turbine – Repair of PR-25-90 turbine flow range