25 мая

PAO TGK-2

– Construction and installation work upon the unit compressor system of the Arkhangelskaya CHPP for PAO TGK-2
– Repair of the main boiler and auxiliary equipment of the Severodvinskaya CHPP-1 for PAO TGK-2
– Maintenance service of turbo generators of ATETS, STETS-1 PAO TGK-2 control system for PAO TGK-2
– Repair of the main turbine and auxiliary equipment of the Severodvinskaya CHPP-1 for PAO TGK-2.