5-26-2020
AO MTSBK
Major repair of a PR-6-35/15/5M at the station №5 (equipment №103925).
Major repair of a PR-6-35/15/5M at the station №5 (equipment №103925).
Current repair of a steam turbine with a three-phase current generator at the station №4 (SN 5803, equipment №2791).
Front-end engineering and design on a turbo generator reconstruction at the station №2 for organizing an extra regulated steam extraction…
Installation of metal constructions at the OAO Ust-Ilimsky LPK in Ust-Ilimsk.
Upgrading work on a generator at the station №Upgrading work on a generator at the station №4 of the PAO…
Construction and installation work on CHPP anti-terrorism security and technical resistance against burglary improvement for PAO TGK-2.