11-2-2020
Yuzhnaya CHPP-22
All types of repair of TZFG-160-2MUZ generators
All types of repair of TZFG-160-2MUZ generators
Replanning of the control room selling area
Major overhaul of the Т-87 (100)-90 turbo generator at the station №4 at the Chitenskaya CHPP-1 (equipment №Т000666)
Major overhaul of the ТТК-40-2UZ-P steam turbine generator (equipment №10МКА20) which is situated at GSR Energo TETS PGU. GSR TETS…
Major overhaul of the BKZ-420-140 boiler unit with dashers replacement at the Petrozavodskaya CHPP which is the branch of Karelskij…
Replanning of the control room selling area with inner lining and brand design modernization to transform it to the new…