5-25-2020
OOO YUMZ
Major repair of a АR-6-11 turbine at the station №2 and the T2-6-2 generator
Major repair of a АR-6-11 turbine at the station №2 and the T2-6-2 generator
Installation of manufacturing equipment on the site of KHuadian-Teninskaya CHPP.
Reconstruction work on the turbo generator condenser at the station №7 with the replacement of the tube bundle of the…
̶ Repair of the main and auxiliary turbine equipment on the site in Apatity, ApTETS industrial site, the Murmansk Region̶…
Major repair of a PR-6-35-15/5 steam turbine at the station №4 at the turbine room of the TPP-2
Repair of a rotor half coupling of a generator at the station №9 of the OTEK Branch in Seversk, Avtodoroga…