5-25-2020
PAO TGK-14
Installation of a PR-30- 90/10/1,3 steam turbine, auxiliary equipment, pipework and metal structures.
Installation of a PR-30- 90/10/1,3 steam turbine, auxiliary equipment, pipework and metal structures.
– Reaming on the half couplings of a PT-25-90/10 turbine – Repair of PR-25-90 turbine flow range
Major repair of a PSV 315-14-23 boiler at the station №1 with a full replacement of pipes
Repair and maintenance service of main and auxiliary equipment as well as the balance of plant.
Major repair of a R-12-35/5 turbine unit at the station №5 of the TPP-2
All kinds of repair of steam turbine plants, generators and other auxiliary equipment of a CHPP ̶ Repair of gas…