25
мая
OOO KVARTZ Group
– Major repair of a Т-50/60-8,8 turbine at the station №2 SP GRES, current repair of a Т-43-90 turbine at the station №5 (flow range, rotor metal control) SP GRES-2
– ̶Performance of work as part of a GTE-160 gas turbine plant master inspection at the station №21 of the Kaliningradskaya CHPP-2 Branch AO Inter RAO – Electrogeneratsiya
– Assembly and disassembly works on stator winding while carrying out emergency repair of a TFP-160- 2MUZ generator at the station №3 (G-3) on the premises of the Severo-Zapadnaia TETS im. A. G. Borisa Branch AO Inter RAO – Electrogeneratsiya




