OAO Ilim Group (Bratsk)

Disassembly of the first and the fourth turboalternator plants with PR-6-35/15/0,5 turbines and T-6-2 electric generators on grids 1-4, B-D, N-S and disassembly of an upper raft under them as part of Reconstruction of the TPP-3 turbine house project to prepare the site for assembly of new equipment

Construction of the R-32-90 steam turbine with a generator №1 and the Р-32-90 steam turbine with a generator №4 foundation as part of the Reconstruction of a TPP turbine house project

Installation of a steam turbine with a generator №1 (equipment №36201040014698) and a steam turbine with a generator №4 (equipment №36201040014699)

Major repair of a TGR-12-35/5 (equipment №362010400002592)

Production and installation of metal structures of a steam turbine with a generator №1 (equipment №36201040014698) and a steam turbine with a generator №4 (equipment №36201040014699) in compliance with technical documentation