25 мая

AO Inter RAO – Electrogeneratsiya

̶ Major and Current repair of a main and auxiliary Т-150- 7,7 steam turbines equipment at the station №10 and 20 for the Kaliningradskaya CHPP-2
̶ Channeling and buffing of slip rings, balancing of the 1G-PT generator (model TZFP-160-2MUZ 1G-PT) rotor of the Unit 1 (2011 YOM, OAO Power Machines, Saint-Petersburg) (equipment № 04/001769) for the Urengoyskaya GRES